Coburn Crossing

10470 E Jibboom St
Town of Truckee

Total Units: 138 multi-family units
Achievable Housing Units: 138

Low Income (0-80% AMI): 3
Moderate Income (81-120% AMI): 3

Locally Orientated Requirement Units: 132

Status: Completed Summer 2018

Coldstream Commons

Town of Truckee
Total Units: 48
Achievable Housing Units: 48

Low Income (0-80% AMI): 47
Property Manager Unit: 1

Local Deed Restricted Units; 48

Status: Completed Fall 2021

Frishman Hollow II

Town of Truckee

Total Units: 68
Achievable Housing Units: 68

Low Income (0-80% AMI): 67
Property Manager Unit: 1

Local Deed Restricted Units: 68

Status: Completed Winter 2021

 

Grocery Outlet

Town of Truckee

Total Units: 3
Achievable Housing Units: 3

Low Income (0-80% AMI): 2
Moderate Income (81-120% AMI): 1

Local Deed Restricted Units: N/A

Status: Completed Summer 2020

Meadow View Place

Placer County

Total Units: 56
Achievable Housing Units: 56

Low Income (0-80% AMI): 56

Status: Completed Winter 2021

Truckee Artist Lofts (Railyard Master Plan)

Town of Truckee
Total Units: 77
Achievable Housing Units: 76

Low Income (0-80% AMI): 76
Property Manager Unit: 1

Local Deed Restricted Units: 77

Status: Completed Fall 2021

UNITS
81 – 120% AMI

Completed

12

Tahoe City Marina

Placer County

Total Units: 10
Achievable Housing Units: 10

Moderate Income (81-120% AMI): 8
Above Moderate Income (up to 195%): 2

Local Deed Restricted Units: 0

Status: Completed 2020

Grocery Outlet
Town of Truckee

Total Units: 3
Achievable Housing Units: 3

Low Income (0-80% AMI): 2
Moderate Income (81-120% AMI): 1

Local Deed Restricted Units: N/A

Status: Completed Summer 2020

Coburn Crossing

10470 E Jibboom St
Town of Truckee

Total Units: 138 multi-family units
Achievable Housing Units: 138

Low Income (0-80% AMI): 3
Moderate Income (81-120% AMI): 3

Locally Orientated Requirement Units: 132

Status: Completed Summer 2018

UNITS
121 – 245% AMI

Completed

166

Quality Automotive

11500 Donner Pass Rd.
Town of Truckee

Total Units: 2
Achievable Housing Units: 1

Above Moderate Income (up to 195% AMI): 1

Local Deed Restricted Units: 1

Status: Completed Summer 2018

Tahoe City Marina

Placer County

Total Units: 10
Achievable Housing Units: 10

Moderate Income (81-120% AMI): 8
Upper Moderate Income (up to 195%): 2

Local Deed Restricted Units: 0

Status: Completed 2019

Coburn Crossing

10470 E Jibboom St
Town of Truckee

Total Units: 138 multi-family units
Achievable Housing Units: 138

Low Income (0-80% AMI): 3
Moderate Income (81-120% AMI): 3

Locally Orientated Requirement Units: 132

Status: Completed Summer 2018

Hopkins Village

Placer County

Total Units: 50
Achievable Housing Units: 50

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (120+): 30 completed

Local Deed Restricted Units: 40

Status: 40 completed, 10 under construction

Fast Lane
11991 CA-267
Town of Truckee

Achievable Housing Units: 1

Above Moderate Income (120%AMI+)

UNITS
TOTAL ACHIEVABLE

Under Construction

20

UNITS
0 – 80% AMI

Under Construction

1+

UNITS
81 – 120% AMI

Under Construction

15

Donner Lake Six

Town of Truckee

Total Units: 6
Achievable Housing Units: 6

Moderate Income (81-120% AMI): TBD

Above Moderate Income (up to 195%): TBD

Deed Restricted to Local Occupancy: 6

Status: Under Construction

Village at Grey's Crossing
10012 Edwin Way
Town of Truckee

Total Units; 36
Moderate Income (81-120% AMI): 9

Status: Under Construction

UNITS
121 – 245% AMI

Under Construction

21

 

Hopkins Village

Placer County

Total Units: 50
Achievable Housing Units: 50

Above Moderate Income (120% AMI +) = 20

Local Deed Restricted Units: 40

Status: 40 completed, 10 under construction

Pioneer Commerce Center Apartments

Town of Truckee

Total Units: 9

Achievable Housing Units: 1

Local Preference: 1

 

UNITS
TOTAL ACHIEVABLE

Approved

66

UNITS
0 – 80% AMI

Approved

58

Joerger Ranch Phase II

Town of Truckee

Total Units: 69
Achievable Housing Units: 12

Low Income (0-80% AMI): 8
Local Preference: 4

Local Deed Restricted Units: 12

Status: Approved, unbuilt

Joerger Ranch Phase III

Town of Truckee

Total Units: 109
Achievable Housing Units: 18

Low Income (0-80% AMI): 18

Local Deed Restricted Units: NA

Status: Approved, unbuilt

Industrial Way Mixed-Use Project

Town of Truckee

Total Units: 9
Achievable Housing Units: 3

Low Income (0-80% AMI): 1
Local Preference: 2

Status: Approved, unbuilt

Estates-Meadows

Town of Truckee

Total Units: 30
Achievable Housing Units: 30

Low Income (0-80% AMI): 30

Status: Approved, unbuilt

Skislope Way Townhomes

Town of Truckee

Low Income (0-80%mAMI): 1

UNITS
81 – 120% AMI

Approved

1+

Palisades Townhomes 2

Town of Truckee

Total Units: 9
Moderate Income (81-120% AMI): 1

Multi-family residential. 1 for-sale deed restricted unit

Status: Approved

7UNITS
121 – 245% AMI

Approved

7

Industrial Way Mixed-Use Project

Town of Truckee

Total Units: 9
Achievable Housing Units: 3

Low Income (0-80% AMI): 1
Local Preference: 2

Status: Approved, unbuilt

Joerger Ranch Phase II

Town of Truckee

Total Units: 69
Achievable Housing Units: 12

Low Income (0-80% AMI): 8
Local Preference: 4

Local Deed Restricted Units: 12

Status: Approved, unbuilt

UNITS
TOTAL ACHIEVABLE

Pending

178+

UNITS
0 – 80% AMI

Pending

TBD

Pacific Crest Commons

Town of Truckee

Total Units: 55
Achievable Housing Units: 55

Low to Moderate Income (0-120% AMI): 55

Local Deed Restricted Units: 55

Status: Pending State approval

Dollar Creek Crossing

Placer County

Total Units: 110 Units, 80 MF For Rent Units and 30 SF For Sale Units
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: TBD

Status: Application Submited

UNITS
81 – 120% AMI

Pending

TBD

Jibboom Street Residences

Town of Truckee

Total Units: 83
Achievable Housing Units: 13

Low to Moderate Income (0-120% AMI): 13

Local Deed Restricted Units: N/A

Status: Pending approval

Dollar Creek Crossing

Placer County

Total Units: 110 Units, 80 MF For Rent Units and 30 SF For Sale Units
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: TBD

Status: Application Submited

UNITS
121 – 245% AMI

Pending

TBD

Dollar Creek Crossing

Placer County

Total Units: 110 Units, 80 MF For Rent Units and 30 SF For Sale Units
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: TBD

Status: Application Submited

UNITS
TOTAL ACHIEVABLE

Pre-Application

143

UNITS
0 – 80% AMI

Pre-Application

TBD

Tahoe Inn Project

Placer County

Total Units: 111 (51 units , 60 multi-person dorm unit and commercial space)
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Pending

Truckee River Cohousing

Town of Truckee

Total Units: 32
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Pre-Application

UNITS
81 – 120% AMI

Pre-Application

TBD

Tahoe Inn Project

Total Units: 111 (51 units , 60 multi-person dorm unit and commercial space)
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Pending

Truckee River Cohousing

Town of Truckee

Total Units: 32
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Pre-Application

UNITS
121 – 245% AMI

Pre-Application

TBD

Tahoe Inn Project

Total Units: 111 (51 units , 60 multi-person dorm unit and commercial space)
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Pending

Truckee River Cohousing

Town of Truckee

Total Units: 32
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Pre-Application

UNITS
TOTAL ACHIEVABLE

On Hold

32+

UNITS
0 – 80% AMI

On Hold

32+

Grays Crossing

Town of Truckee

Total Units: TBD
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Parcel D – community process; Cottage site: pre-application phase

Homewood CEP Project

Placer County

Total Units: 244
Achievable Housing Units: 13+

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: 13

Status: Approved, unbuilt. On hold

Lazando Project

Town of Truckee

Total Units: 2+
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Possibly part of the SB2 process

Martis Valley West

Placer County

Total Units: 760
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Approved, unbuilt. Under litigation

Northstar Highlands II

Placer County

Total Units: 516
Achievable Housing Units: 32

Low Income (0-80% AMI): 32

Local Deed Restricted Units: N/A

Status: Approved, unbuilt. On hold

Plump Jack

Placer County

Total Units: TBD
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Approved, unbuilt. On hold

Village at Squaw Valley

Town of Truckee

Total Units: 386
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Under litigation

Alpine Sierra

Placer County

Total Units: 38
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD

Local Deed Restricted Units: N/A

Status: Approved, unbuilt

UNITS
81 – 120% AMI

On Hold

TBD

Grays Crossing

Town of Truckee

Total Units: TBD
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Parcel D – community process; Cottage site: pre-application phase

Homewood CEP Project

Placer County

Total Units: 244
Achievable Housing Units: 13+

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: 13

Status: Approved, unbuilt. On hold

Lazando Project

Town of Truckee

Total Units: 2+
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Possibly part of the SB2 process

Martis Valley West

Placer County

Total Units: 760
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Approved, unbuilt. Under litigation

Plump Jack

Placer County

Total Units: TBD
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Approved, unbuilt. On hold

Village at Squaw Valley

Town of Truckee

Total Units: 386
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Under litigation

Alpine Sierra

Placer County

Total Units: 38
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD

Local Deed Restricted Units: N/A

Status: Approved, unbuilt

UNITS
121 – 245% AMI

On Hold

TBD

Grays Crossing

Town of Truckee

Total Units: TBD
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Parcel D – community process; Cottage site: pre-application phase

Homewood CEP Project

Placer County

Total Units: 244
Achievable Housing Units: 13+

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: 13

Status: Approved, unbuilt. On hold

Lazando Project

Town of Truckee

Total Units: 2+
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Possibly part of the SB2 process

Martis Valley West

Placer County

Total Units: 760
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Approved, unbuilt. Under litigation

Plump Jack

Placer County

Total Units: TBD
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Approved, unbuilt. On hold

Village at Squaw Valley

Town of Truckee

Total Units: 386
Achievable Housing Units: TBD

Low Income (0-80% AMI): TBD
Moderate Income (81-120% AMI): TBD
Above Moderate Income (up to 195%): TBD

Local Deed Restricted Units: N/A

Status: Under litigation

FUNDING
TOTAL PROGRAMS & PROJECTS

Collective Results

$50.14M

PROGRAM FUNDING

Collective Results

$45.43M+

January 2018

Briefing on State Bond Housing Package + Monitoring of Funds 4 Matrix on entity types for capital attraction

September 2018

$600K - Committed by Martis Fund to support down payment assistance program

January 2019

$600K - Committed by Martis Fund to support down payment assistance program

April 2019

$500K - Committed by Martis Fund to support down payment assistance program

June 2019

$500K - Committed by Martis Fund to support down payment assistance program

September 2019

$500K - Committed by Martis Fund to support down payment assistance program

$250K - Committed by Martis Fund to support down payment assistance program

$2M - Town of Truckee General Fund set aside (one time) for affordable and workforce housing programs

$500K - allocated from Placer County general fund to develop a pilot program to accelerate the production of affordable housing (2019/2020)

January 2020

$500K - Committed by Martis Fund to support down payment assistance program

$250K - Committed by Martis Fund to support down payment assistance program

$2M - Town of Truckee General Fund set aside (one time) for affordable and workforce housing programs

$500K - allocated from Placer County general fund to develop a pilot program to accelerate the production of affordable housing (2019/2020)

April 2020

$500K - Committed by Martis Fund to support down payment assistance program

$250K - Committed by Martis Fund to support down payment assistance program

$2M - Town of Truckee General Fund set aside (one time) for affordable and workforce housing programs

$500K - allocated from Placer County general fund to develop a pilot program to accelerate the production of affordable housing (2019/2020)

$20K - Program Related Investment

PROJECT FUNDING

Collective Results

$3.52M+

January 2018

$9.6M - support of Artist Lofts, Truckee Railyard Project as part of application of tax exemption

$16.6M - Application in progress for 56-units, seeking funding from State Sustainability Grants

$660K - Committed by TTAD for Lazando project to support rental housing for missing middle income levels

April 2018

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project

$16.6M - Application in progress for 56-units, seeking funding from State Sustainability Grants

$660K - Committed by Truckee Tahoe Airport District for Lizondo project to support 22 units of rental housing for missing middle income levels

$2M - Truckee General Fund for roundabout to support 138 units at Coburn Crossing

$10.6M - State Funds committed to Cold Stream for 48 units for low-income housing

September 2018

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project

$16.6M - Application in progress for 56-units, seeking funding from State Sustainability Grants

$660K - Committed by Truckee Tahoe Airport District for Lizondo project to support 22 units of rental housing for missing middle income levels

$2M - Truckee General Fund for roundabout to support 138 units at Coburn Crossing

$10.6M - State Funds committed to Cold Stream for 48 units for low-income housing

January 2019

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

April 2019

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

June 2019

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

September 2019

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

January 2020

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

April 2020

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

FUNDING
TOTAL PROGRAMS & PROJECTS

Collective Results

$50.14M

PROGRAM FUNDING

Collective Results

$45.43M+

January 2018

Briefing on State Bond Housing Package + Monitoring of Funds 4 Matrix on entity types for capital attraction

September 2018

$600K - Committed by Martis Fund to support down payment assistance program

January 2019

$600K - Committed by Martis Fund to support down payment assistance program

April 2019

$500K - Committed by Martis Fund to support down payment assistance program

June 2019

$500K - Committed by Martis Fund to support down payment assistance program

September 2019

$500K - Committed by Martis Fund to support down payment assistance program

$250K - Committed by Martis Fund to support down payment assistance program

$2M - Town of Truckee General Fund set aside (one time) for affordable and workforce housing programs

$500K - allocated from Placer County general fund to develop a pilot program to accelerate the production of affordable housing (2019/2020)

January 2020

$500K - Committed by Martis Fund to support down payment assistance program

$250K - Committed by Martis Fund to support down payment assistance program

$2M - Town of Truckee General Fund set aside (one time) for affordable and workforce housing programs

$500K - allocated from Placer County general fund to develop a pilot program to accelerate the production of affordable housing (2019/2020)

April 2020

$500K - Committed by Martis Fund to support down payment assistance program

$250K - Committed by Martis Fund to support down payment assistance program

$2M - Town of Truckee General Fund set aside (one time) for affordable and workforce housing programs

$500K - allocated from Placer County general fund to develop a pilot program to accelerate the production of affordable housing (2019/2020)

$20K - Program Related Investment

PROJECT FUNDING

Collective Results

$3.52M+

January 2018

$9.6M - support of Artist Lofts, Truckee Railyard Project as part of application of tax exemption

$16.6M - Application in progress for 56-units, seeking funding from State Sustainability Grants

$660K - Committed by TTAD for Lazando project to support rental housing for missing middle income levels

April 2018

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project

$16.6M - Application in progress for 56-units, seeking funding from State Sustainability Grants

$660K - Committed by Truckee Tahoe Airport District for Lizondo project to support 22 units of rental housing for missing middle income levels

$2M - Truckee General Fund for roundabout to support 138 units at Coburn Crossing

$10.6M - State Funds committed to Cold Stream for 48 units for low-income housing

September 2018

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project

$16.6M - Application in progress for 56-units, seeking funding from State Sustainability Grants

$660K - Committed by Truckee Tahoe Airport District for Lizondo project to support 22 units of rental housing for missing middle income levels

$2M - Truckee General Fund for roundabout to support 138 units at Coburn Crossing

$10.6M - State Funds committed to Cold Stream for 48 units for low-income housing

January 2019

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

April 2019

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

June 2019

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

September 2019

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

January 2020

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

April 2020

$12.85M - $3.25M local dollars leveraged $9.6M through state tax credits to support the Artist Lofts, Truckee Railyard Project.

$2M - Truckee General Fund investment for roundabout for 138 local-deed restricted apartment project (Coburn Crossing)

$10.6M - State Funds committed to Cold Stream project for 48-low income housing units

$16.6M - Funding from State Sustainability Grants secured for 56-unit project in Placer County

$780K - Total pledge from Truckee Tahoe Airport District for Lazando project (20 apartments)

$2.6M - Nahas Project land purchase pledges to date: Placer County Housing Trust Fund ($1.05M), Placer County Transient Occupancy Taxes ($1M), Truckee Tahoe Airport District ($500K), Placer County Canceled Capital Funds ($50K) (*note: $1M gap)

Translate »
Get MHC News

Get MHC News

Join our mailing list to receive the latest news and updates from Mountain Housing Council.

Thank you for subscribing. Please check your email and confirm your subscription.